---
title: PeopleSoft 9.2 HCM Upgrade at Boston Water and Sewer Commission
description: Beacon Applications Services has completed a PeopleSoft 9.2 upgradefor HCM  with Boston Water and Sewer.
---

[Beacon Application Services Blog ](https://www.beaconservices.com/blog)

# [PeopleSoft 9.2 HCM Upgrade at Boston Water and Sewer Commission](https://www.beaconservices.com/blog/peoplesoft-9.2-upgrade-at-boston-water-and-sewer)

 Written by [Dan Maude](https://www.beaconservices.com/blog/author/dan-maude) | Dec 18, 2017 4:04:59 PM

### Beacon Services Completes

### PeopleSoft 9.2 Upgrade with BWSC 

Beacon Services is pleased to announce that Boston Water and Sewer Commission went live over the weekend with an HCM upgrade from 9.1 to 9.2 (Tools 8.56.03/Image 23). The cutover weekend was uneventful. Congratulations and thanks go out to the entire team. 

Established in 1977, BWSC owns, maintains and operates New England's oldest and largest water, sewer and stormwater systems. 

[View full post](https://www.beaconservices.com/blog/peoplesoft-9.2-upgrade-at-boston-water-and-sewer)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Dan Maude"
  },
  "dateModified" : "2018-06-29T15:28:45.860Z",
  "datePublished" : "2017-12-18T16:04:59Z",
  "headline" : "PeopleSoft 9.2 HCM Upgrade at Boston Water and Sewer Commission",
  "image" : {
    "@type" : "ImageObject",
    "height" : 110,
    "url" : "https://www.beaconservices.com/hubfs/boston-water-logo.jpeg",
    "width" : 300
  },
  "mainEntityOfPage" : "https://www.beaconservices.com/blog/peoplesoft-9.2-upgrade-at-boston-water-and-sewer",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60.0,
      "url" : "https://www.beaconservices.com/hs-fs/hub/140750/file-462912837.jpg",
      "width" : 130.625
    },
    "name" : "Beacon Services Blog"
  }
}
```